Skip to topic | Skip to bottom
Grimoires
Grimoires.WorkPlan

Start of topic | Skip to actions

Workplan

The project is structured around four workpackages:

  • WP1: Refactoring for robustness, performance, and compliance
  • WP2: Applications
  • WP3: User Interface
  • WP4: Security

The set of Tasks:

WP Number Task
WP1 T1.1 Capturing requirements and evaluating
T1.2 Refactoring
T1.3 Building testing environment
T1.4 Testing and improving
WP2 T2.1 Capturing requirements and evaluating
T2.2 Integrating with myGrid
T2.3 Integrating with GriPhyN chimera
T2.4 Integrating with EGEE
WP3 T3.1 Capturing UI requirement and evaluating
T3.2 Defining UI Scenarios, designing UI
T3.3 Programming UI for Browsing registry
T3.4 Programming UI for updating registry
WP4 T4.1 Capturing requirement and evaluating
T4.2 Designing Grid based access control
T4.3? Implementing registry access control
T4.4 Testing

The set of deliverables:

Number Deliverable
M1.1 testing environment released
D1.1 Robust Grimoires registry
D2.1 myGrid functionality demonstrator
D2.2 GriPhyN functionality demonstrator
D2.3 EGEE functionality demonstrator
M3.1 User Interface Requirement and design document
D3.1 User Interface Software
M4.1 Security requirement and design document
D4.1 Robust and secure Grimoires registry
D4.2 Secure user interface
D4.3 myGrid demonstrator
D4.4 GriPhyN demonstrator
D4.5 EGEE demonstrator

Project Gantt chart

Grimoires Workplan (GIF)

-- LucMoreau - 02 Nov 2004
to top

I Attachment sort Action Size Date Who Comment
grimoires-workplan.mpp manage 171.0 K 02 Nov 2004 - 18:13 LucMoreau Grimoires Workplan (MS Project)
grimoires-workplan.gif manage 28.4 K 02 Nov 2004 - 18:14 LucMoreau Grimoires Workplan (GIF)

You are here: Grimoires > ProjectManagement > WorkPlan

to top

Copyright 2004 by the University of Southampton